Features | PLS HVR 505R KIT Rotary Laser Level System Features:PLS HVR 505R Rotary Laser- Accurate up to 1/8" at 100 feet
- With a rotary laser radius of 500 feet or a 1,000 ft diameter
- Fully self-leveling up to 5 so you don't have to waste time messing with bubble vials
- When out of level it will sound a warning alarm
- Usable in a horizontal position or you can lay it on it's side and use it in a Vertical position
- When used on it's side, the rotary laser beam produces a vertical plumb reference line
- It is capable of a dual manual slope which means you can use it to do grade in addition to the self leveling mode
- Has both a plumb-up and a plumb-down beam, as well as its rotary level beam
- The plumb-up and plumb-down produces a single dot on the ceiling and on the floor, which is directly plumb up and down from the rotary level beam
PLS HVD 505 Detector- Used to detect beam during outside use
- Designed to provide point-to-point and line reference for layout within a 1000 foot diameter indoor and outdoors
- Combine your PLS laser with a laser detector and maximize your utility
- Works with the PLSHVR505 laser system
PLS Tripod- Made of lightweight and durable aluminum
- Utilizes a 5/8-11 threaded fitting which works with all PLS 5/8-11 tools and universal mounts
- Fully adjustable from 32 inches to 60 inches in height
- The leg tips are designed for exterior use and easily shove into the ground
Grade Rod- Expandable up to 9 feet 10 inches
- Made from durable aluminum construction
- Measurements are in Inches and Tenths
- Allows the PLS SLD Detector to attach for elevation checks
PLS HVR 505R KIT Rotary Laser Level System Applications:- Mechanical/HVAC Contractors
- Layout and Level all-thread and strut for trapezes
- Layout design on slab or sub floor and transfer it to ceiling
- Allows you to level HVAC system with a tape measure
- Masonry and Concrete Contractor
- Level concrete pads and foundations
- Layout form boards
- Aligning anchor bolts
- Plumb and level block walls during installation
- Steel Stud Framers
- Laying out jobs and snapping control lines
- 3-4-5 for square walls and fasten track
- Plumb track with cantilevered plumb beam
- Installing door bucks
- Framing Contractor
- Laying out control lines on slabs or decking
- Alignment of structural steel framing
- Plumb steel or wooden studs and walls
- Align headers by using the wall bracket
- Laying out stair cases
- Laying out trusses
- Acoustical Ceilings
- Layout and align drop ceilings
- Installation of wall angle and main runners when used with chalk line
|
Log In